El Triunfo (Gold-Silver-Zinc)
El Triunfo Project is 100% owned by Silver Elephant. The Project is located in the Bolivian department of La Paz, about 75km to the east of Bolivia’s capital city of La Paz and it spans an area of approximately 256 hectares. El Triunfo has access to power and water and is accessible by road year-round. Silver Elephant first drilled 49m of 0.42 g/t Au, 35g/t Ag, 1.2% Zn, 0.8% Pb in 2020. The company maintains a positive relationship with the local community.

Bolivia Map

El Triunfo Project Map
On July 13, 2020, Silver Elephant announced having entered into a binding sales and purchase agreement to acquire the El Triunfo Gold-Silver-Lead-Zinc Project.
Exploration was conducted in 2005–07 by Solitario Resources, which made 3 drill holes, all of which intercepted mineralization. Historical hole TR-001 returned 94.2 meters grading 0.65%Pb, 0.39%Zn, 21.8 g/t Ag, and 0.39 g/t Au (0.95 gpt AuEq), according to Solitario Resources SEC 10K filings. Only 20% of the property was explored by Solitario.
The mineralization is characterized by pyrite, arsenopyrite, galena, and sphalerite and carries gold, silver, and zinc and lead in various proportions.
Mineralization outcrops at the surface and continues for at least 750 meters in three discrete blocks, known as A, B, and C. The mineralized blocks have widths varying from 20m to 150m and are locally displaced for several meters by north-east trending faults.
In the past decade, some artisanal mining has been developed where gold mineralization has been identified. Those areas have been principally mined for gold. They demonstrate a continuity of mineralization along the strike and to modest depths.
The Triunfo Project contains polymetallic vein-style mineralization hosted in metasediments of the Silurian and Devonian periods. The metasediments were intruded by nearby plutonic batholiths which are likely related to the mineralizing event. This style of mineralization is well documented in Bolivia. Examples include Cerro Rico and Porco, located in and around Potosi.
The mineralization is characterized by multiple veins (up to 1.0m wide) and veinlets. They are emplaced along fractures and faults that have developed on the flanks of an east-west trending anticlinal-synclinal sequence. Mineralization is also noted to occur in the sedimentary planes between slate layers. The slate layers can manifest as stockwork-style mineralization which tends to be elongated parallel to the anticlinal axis.
On August 19, 2020, it has received the complete assay results from the Company’s first diamond drill program at its 100%-controlled El Triunfo Au-Ag-Zn-Pb project in Bolivia.
Borehole TR007 intercepted 48.9 meters of mineralization grading 0.42 g/t gold, 35.5 g/t silver, 1.17% zinc, and 0.83% lead (1.45 g/t AuEq) within 98.9 meters of mineralization grading 1.04 g/t AgEq starting 13.0 meters downhole. Exploration targets have insufficient exploration data to define a mineral resource.
Silver Elephant’s maiden drill program at El Triunfo successfully demonstrates broad continuity of east-west mineralization spanning a minimum 225 meters in strike. It is open beyond 100 meters depth in both east and west directions.
Mineralization is hosted in altered black shales exhibiting hydrothermal sheeted quartz-carbonate vein sets that are concentrated along the axes of regional anticlinal fold structures.
Assay results are detailed in the table below:
| Hole ID | From-To | Length (m) |
Au (g/t) |
Ag (g/t) |
Zn % |
Pb % |
AuEq (g/t) |
|---|---|---|---|---|---|---|---|
| TR004 | 14.0-15.0 | 1.0 | 0.24 | 18.85 | 0.21 | 0.65 | 0.70 |
| 17.0-18.0 | 1.0 | 0.74 | 2.21 | 0.03 | 0.04 | 0.78 | |
| 71.0-74.0 | 3.0 | 1.11 | 5.01 | 0.00 | 0.00 | 1.16 | |
| TR005 | 61.0-62.0 | 1.0 | 0.59 | 8.00 | 0.00 | 0.01 | 0.67 |
| 122.0-124.0 | 2.0 | 0.50 | 2.29 | 0.01 | 0.02 | 0.53 | |
| 5.0 | 6.0-1.0 | 0.73 | 3.19 | 0.10 | 0.13 | 0.84 | |
| 20.0-21.0 | 1.0 | 0.15 | 11.10 | 0.35 | 0.29 | 0.48 | |
| 40.0-76.0 | 36.0 | 0.49 | 15.46 | 0.54 | 0.44 | 0.97 | |
| inc… | 58.0-72.0 | 14.0 | 0.48 | 20.23 | 0.76 | 0.66 | 1.16 |
| TR006 | 94.5-101.5 | 7.0 | 0.56 | 23.21 | 0.82 | 0.56 | 1.26 |
| 106.5-107.4 | 0.8 | 0.32 | 12.70 | 0.25 | 0.01 | 0.54 | |
| 120.0-121.0 | 1.0 | 0.07 | 15.90 | 0.50 | 0.67 | 0.62 | |
| 142.8-143.3 | 0.5 | 0.60 | 0.43 | 0.00 | 0.00 | 0.61 | |
| 190.0-191.3 | 1.3 | 0.72 | 89.58 | 2.07 | 0.16 | 2.42 | |
| TR007 | 13.0-111.9 | 98.9 | 0.37 | 22.71 | 0.74 | 0.58 | 1.04 |
| inc… | 63.0-111.9 | 48.9 | 0.42 | 35.49 | 1.17 | 0.83 | 1.45 |
| TR007 | 118.5-119.5 | 1.0 | 0.03 | 4.55 | 0.17 | 0.53 | 0.30 |
| 121.5-122.5 | 1.0 | 0.30 | 3.69 | 0.07 | 0.46 | 0.50 | |
| 125.5-126.3 | 0.8 | 0.56 | 3.18 | 0.09 | 0.03 | 0.63 | |
| 179.0-181.0 | 2.0 | 1.05 | 1.38 | 0.01 | 0.01 | 1.07 | |
| 185.6-186.2 | 0.6 | 0.44 | 5.69 | 0.02 | 0.01 | 0.51 | |
| 196.0-197.0 | 1.0 | 0.74 | 1.46 | 0.00 | 0.00 | 0.76 | |
| TR008 | 6.8-84.0 | 77.3 | 0.31 | 17.65 | 0.57 | 0.53 | 0.85 |
| inc… | 45.0-51.4 | 6.4 | 1.60 | 56.49 | 1.66 | 0.94 | 3.05 |
| TR008 | 138.1-139.1 | 1.0 | 0.71 | 0.90 | 0.01 | 0.00 | 0.72 |
| 149.0-151.0 | 2.0 | 0.10 | 22.73 | 0.78 | 0.03 | 0.61 | |
| 156.0-157.0 | 1.0 | 0.74 | 1.33 | 0.02 | 0.01 | 0.76 | |
| 183.0-183.6 | 0.6 | 1.65 | 2.62 | 0.02 | 0.01 | 1.69 | |
| 231.6-232.6 | 1.0 | 0.41 | 4.50 | 0.00 | 0.00 | 0.46 | |
| 247.5-250.0 | 2.5 | 1.64 | 35.99 | 0.00 | 0.00 | 2.01 | |
| 257.0-258.0 | 1.0 | 0.78 | 2.15 | 0.00 | 0.00 | 0.80 |
calculation uses a gold price of $1,795, a zinc price of $0.93, a lead price of $0.80,
and a silver price of $18.30 (all USD), and assumes a 100% metallurgical recovery.
Gold equivalent values can be calculated using the following formula:
AuEq = Au g/t + (Ag g/t x 0.2243) + (Zn % x 1.385) + (Pb % x 0.3055).
Reported widths in all tables are intercepted core lengths and not true widths,
as relationships with intercepted structures and contacts vary. Based on core-angle
measurements, true widths range from 54% to 65% of reported core length.
In January 2023, Silver Elephant announced diamond drilling results from five holes totaling 1,500 meters were drilled on El Triunfo West Block (“TWB”) and newly discovered El Triunfo East Block (“TEB”) based on induced polarization (“IP”) geophysical anomalies identified in 2021.

Triunfo Drill Hole Collar Plan
TR-009 encountered 14 meters of 2.5 g/t AuEq and TR010 drilled 1.2 meters of 7.7 g/t within 45 meters grading 0.7 AuEq (see Company’s press release dated April 4, 2022). TR009 and TR010 were drilled at eastern and western edges of the Triunfo West block (known strike 750 meters, “TWB”) and successfully expanded the mineralized width and open up the exploration prospects immediately west of the TWB.
TR011, -012, -013 are drilled at wide spacing at the Triunfo East block (“TEB”), a 1.5 kilometer extension to the TWB that is separated by a fault that resulted in this area being previously unexplored until recently.
TR-011 encountered separate intersections of 2 meters of 2.87 g/t AuEq (0.42 g/t Au, 81 g/t Ag, 2.04% Pb, 4 meters of 1.72 g/t AuEq (0.34 g/t Au, 46 g/t Ag, 1.16% Pb, 0.78% Zn), and 1.29% Zn), and 1 meter of 3.5 g/t AuEq (1.4 g/t Au, 75 g/t Ag, 1.82% Pb, and 2.35% Zn) within 298 meters grading 0.14 AuEq, starting from 2 meters downhole.
TR-012 encountered 2 meters of 1.3 g/t AuEq (0.94 g/t Au, 11 g/t Ag, 0.30% Pb, 0.21% Zn), 1 meter of 2.76 AuEq (0.34 g/t Au, 45 g/t Ag, 1.15% Pb, 3.04% Zn), 1 meter of 3.4 AuEq (2.7 g/t Au, 26 g/t Ag, 0.671% Pb, 0.583% Zn), and 2 meters of 2.1 g/t AuEq (1.54 g/t Au, 12 g/t Ag, 0.47% Pb, and 0.76% Zn).
TR-013 encountered 25.7 meters of 1.1 g/t AuEq (0.4 g/t Au, 27 g/t Ag, 0.88% Pb, 0.58% Zn), 3 meters of 3.3 AuEq (1.1 g/t Au, 74 g/t Ag, 2.82% Pb, 1.47% Zn), and 2.6 meters of 1.98 AuEq (0.13 g/t Au, 70.3 g/t Ag, 1.72% Pb, 0.68% Zn).
The results from drill holes TR-011, TR-012 and TR-013 triples the strike length of the Truinfo polymetallic target which is now over 2 kilometers long and indicate that a large mineralizing system is present with notable high grade intercepts. Additional geologic work will be conducted to determine the lithologic and structural controls of the mineralization to come up with high grade drill targets.
Reported results are tabulated below:
| Hole ID | From | To | Width (m) | Au (g/t) |
|---|---|---|---|---|
| TR-011 | 2.0 | 300.1 | 298.1 | 0.06 |
| incl… | 195.0 | 242.0 | 47.0 | 0.18 |
| …and | 197.0 | 201.0 | 4.0 | 0.34 |
| …and | 198.0 | 200.0 | 2.0 | 0.49 |
| …and | 210.0 | 214.0 | 4.0 | 0.42 |
| …and | 218.0 | 219.0 | 1.0 | 1.39 |
| …and | 229.0 | 230.0 | 1.0 | 0.10 |
| TR-012 | 164.0 | 164.5 | 0.5 | 1.04 |
| 177.0 | 179.0 | 2.0 | 0.94 | |
| 184.0 | 187.5 | 3.5 | 0.32 | |
| 195.0 | 196.0 | 1.0 | 0.34 | |
| 201.0 | 203.0 | 2.0 | 1.50 | |
| 234.0 | 236.0 | 2.0 | 1.54 | |
| TR-013 | 64.3 | 90.0 | 25.7 | 0.32 |
| incl… | 64.3 | 65.0 | 0.7 | 0.52 |
| …and | 75.0 | 83.0 | 8.0 | 0.76 |
| …and | 84.0 | 86.6 | 2.6 | 0.13 |
| …and | 286.0 | 290.0 | 4.0 | 0.41 |
*AuEq: Gold equivalent calculation uses a gold price of $1,815, a zinc price of $1.38, a lead price of $1.07, and a silver price of $24.00 (all USD) and assumes a 100% metallurgical recovery. Gold equivalent values can be calculated using the following formula: AuEq = Au g/t + (Ag g/t x 0.0102) + (Zn % x 0.3551) + (Pb % x 0.3055). Core widths are not true widths. True widths are estimated to range between 45-78% of true widths based on core angle measurements.



While conducting due diligence on the Triunfo Project drillhole database, the Company observed several intervals of antimony mineralization from nine inspected diamond-drill-holes recently drilled in 2020 and 2022. The assays of the drill holes are tabulated below. All nine drill holes contained several intersections of antimony grading higher than 0.1%. Hole TR010 contained 1.2-meter intersection grading over 1% antimony.
| Significant Drilling Program Intervals at the Triunfo Project | ||||||
|---|---|---|---|---|---|---|
| Hole ID | From | To | Width | Au | Ag | Sb |
| (m) | (m) | (m) | (g/t) | (g/t) | (%) | |
| TR004 | 70.00 | 71.00 | 1.00 | 0.01 | 1.25 | 0.15 |
| TR004 | 71.00 | 72.00 | 1.00 | 0.37 | 7.76 | 0.12 |
| TR004 | 72.00 | 73.00 | 1.00 | 1.51 | 2.67 | 0.01 |
| TR004 | 73.00 | 74.00 | 1.00 | 0.41 | 4.59 | 0.39 |
| TR004 | 101.90 | 102.50 | 0.60 | 0.13 | 11.85 | 0.09 |
| TR004 | 102.50 | 103.50 | 1.00 | 0.03 | 0.80 | 0.01 |
| TR004 | 123.50 | 124.50 | 1.00 | 0.00 | 1.48 | 0.02 |
| TR004 | 131.50 | 132.50 | 1.00 | 0.01 | 2.99 | 0.01 |
| TR005 | 58.00 | 59.00 | 1.00 | 0.00 | 0.38 | 0.04 |
| TR005 | 61.00 | 62.00 | 1.00 | 0.40 | 8.00 | 0.03 |
| TR005 | 62.00 | 63.00 | 1.00 | 0.04 | 3.53 | 0.84 |
| TR005 | 63.00 | 64.00 | 1.00 | 0.00 | 0.61 | 0.15 |
| TR005 | 64.00 | 66.00 | 2.00 | 0.01 | 0.14 | 0.02 |
| TR006 | 94.50 | 95.00 | 0.50 | 1.63 | >100 | 0.01 |
| TR006 | 190.50 | 191.30 | 0.80 | 0.20 | 76.20 | 0.01 |
| TR008 | 46.00 | 47.00 | 1.00 | 0.36 | 79.30 | 0.01 |
| TR008 | 47.00 | 47.75 | 0.75 | 5.13 | >100 | 0.02 |
| TR008 | 72.00 | 73.00 | 1.00 | 0.02 | 88.90 | 0.03 |
| TR008 | 75.00 | 76.00 | 1.00 | 0.06 | 54.30 | 0.02 |
| TR008 | 77.00 | 78.00 | 1.00 | 0.02 | 3.41 | 0.07 |
| TR008 | 78.00 | 79.00 | 1.00 | 0.02 | 20.00 | 0.10 |
| TR008 | 79.00 | 80.00 | 1.00 | 0.01 | 3.22 | 0.04 |
| TR008 | 81.00 | 82.00 | 1.00 | 0.01 | 1.90 | 0.01 |
| TR008 | 82.00 | 83.00 | 1.00 | 0.04 | 11.15 | 0.10 |
| TR008 | 83.00 | 84.00 | 1.00 | 0.08 | 18.20 | 0.04 |
| TR008 | 247.50 | 248.50 | 1.00 | 1.87 | 63.50 | 0.02 |
| TR009 | 154.00 | 155.00 | 1.00 | 0.11 | >100 | 0.04 |
| TR009 | 155.00 | 156.00 | 1.00 | 0.03 | >100 | 0.02 |
| TR009 | 169.00 | 170.00 | 1.00 | 0.24 | >100 | 0.02 |
| TR009 | 173.00 | 174.00 | 1.00 | 0.11 | >100 | 0.01 |
| TR009 | 174.00 | 175.00 | 1.00 | 0.27 | 88.20 | 0.02 |
| TR009 | 175.00 | 176.00 | 1.00 | 1.92 | 32.50 | 0.02 |
| TR009 | 206.00 | 207.00 | 1.00 | 0.02 | 8.11 | 0.02 |
| TR009 | 226.00 | 227.00 | 1.00 | 0.02 | 3.33 | 0.01 |
| TR010 | 31.00 | 33.00 | 2.00 | 0.01 | 3.45 | 0.14 |
| TR010 | 37.00 | 39.00 | 2.00 | 0.00 | 1.23 | 0.04 |
| TR010 | 39.00 | 39.60 | 0.60 | 0.01 | 4.41 | 0.31 |
| TR010 | 39.60 | 40.80 | 1.20 | 0.30 | 61.40 | >1 |
| TR010 | 40.80 | 42.00 | 1.20 | 0.00 | 1.10 | 0.03 |
| TR010 | 42.00 | 44.00 | 2.00 | 0.00 | 1.09 | 0.03 |
| TR010 | 44.00 | 46.00 | 2.00 | 0.00 | 2.31 | 0.14 |
| TR010 | 46.00 | 48.00 | 2.00 | 0.00 | 1.50 | 0.05 |
| TR010 | 117.00 | 118.00 | 1.00 | 0.00 | 0.79 | 0.01 |
| TR010 | 149.00 | 150.00 | 1.00 | 0.34 | 4.42 | 0.05 |
| TR010 | 239.00 | 240.00 | 1.00 | 0.02 | 5.22 | 0.01 |
| TR011 | 199.00 | 200.00 | 1.00 | 0.09 | >100 | 0.01 |
| TR011 | 218.00 | 219.00 | 1.00 | 0.13 | 75.00 | 0.01 |
| TR011 | 229.00 | 230.00 | 1.00 | 0.02 | 99.70 | 0.10 |
| TR011 | 247.00 | 248.00 | 1.00 | 0.01 | 5.71 | 0.01 |
| TR012 | 260.00 | 261.00 | 1.00 | 0.05 | 7.14 | 0.08 |
| TR013 | 77.00 | 78.00 | 1.00 | 0.16 | 92.80 | 0.01 |
| TR013 | 85.20 | 86.00 | 0.80 | 0.00 | 67.60 | 0.01 |
| TR013 | 86.00 | 86.60 | 0.60 | 0.02 | 49.40 | 0.14 |
| TR013 | 86.60 | 88.00 | 1.40 | 0.00 | 5.22 | 0.02 |
| TR013 | 88.00 | 89.00 | 1.00 | 0.46 | 6.30 | 0.31 |
| TR013 | 89.00 | 90.00 | 1.00 | 0.01 | 6.12 | 0.29 |
| TR013 | 90.00 | 91.00 | 1.00 | 0.01 | 1.97 | 0.15 |
| TR013 | 93.00 | 94.00 | 1.00 | 0.02 | 6.58 | 0.11 |
| TR013 | 254.00 | 255.00 | 1.00 | 0.03 | 15.05 | 0.04 |
| TR013 | 260.00 | 261.00 | 1.00 | 0.01 | 15.60 | 0.01 |
| TR013 | 265.00 | 267.00 | 2.00 | 0.00 | 8.13 | 0.02 |
| TR013 | 286.00 | 287.10 | 1.10 | 0.21 | 7.89 | 0.01 |
| TR013 | 287.70 | 288.45 | 0.75 | 0.20 | 18.85 | 0.02 |
| TR013 | 288.45 | 289.00 | 0.55 | 0.01 | 9.33 | 0.05 |
| TR013 | 289.00 | 290.00 | 1.00 | 0.02 | 8.61 | 0.04 |
The Company is highly encouraged by the antimony results and will continue to evaluate this potential by reviewing and assaying prior historic drill core. The Company is optimistic about exploring Triunfo Project’s potential to meet the increasing demand in critical sectors like energy storage, military and industrial alloy manufacturing.
Antimony price has reached over US$40,000 per ton in 2025 representing over a 250% increase since January 2024 according to S&P Global[1]. This surge follows China’s announcement on January 1, 2025, restricting antimony exports to the United States as part of broader controls on critical minerals, including antimony, gallium, and germanium.
Antimony is a crucial material in flame retardants, lead-acid batteries, ammunition, and various metal alloys critical for industrial and defense applications.
According to the U.S. Geological Survey[2], global annual antimony production was approximately 83,000 metric tons in 2023. China currently dominates global antimony supply, accounting for around 50% of total production and most of the world’s exports. The United States currently has no domestic antimony production and relies entirely on imports to meet its antimony requirements. Bolivia produces approximately 3,000 metric tons of antimony annually, accounting for about 3.6% of global supply according to USGS.
Conceptual El Triunfo West Block Starter Pit
In light of gold and silver prices above US$4,000 and US$60 per ounce, respectively, the Company is modeling a conceptual starter pit on the West Block measuring a strike length of approximately 274 meters, 105 meters wide, and at 20 meters deep. The proposed starter pit area demonstrated extensive near-surface gold mineralization supported by gold assays from 4 drill holes and 122 surface samples.
Table 1. Drill Intercepts Within the Area Under Evaluation, West Block
| Drill hole | Dip (°) |
From (m) | To (m) | Length (m) | Au (g/t) | Higher-grade interval |
|---|---|---|---|---|---|---|
| TR-001 | -60° | 53.7 | 88.0 | 34.3 | 0.64 | 1.0 m at 2.20 g/t Au |
| TR-002 | -70° | 10.7 | 91.8 | 81.1 | 0.30 | 3.58 m at 0.83 g/t Au |
| TR-006 | -70° | 40.0 | 76.0 | 36.0 | 0.49 | – |
| TR-008 | -70° | 6.8 | 84.0 | 77.3 | 0.31 | 6.4 m at 1.60 g/t Au |
Note: Intervals for drill holes TR-001 and TR-002, drilled by Solitario Resources between 2005 and 2007, were compiled by the Company from the historical Project database rather than taken from results published by Solitario Resources. The TR-001 interval is a gold-only interval and differs from the 94.2-meter polymetallic interval reported by Solitario Resources and described below. Results for drill holes TR-006 and TR-008 are as previously reported by Silver Elephant in its news release dated November 25, 2020. Reported lengths are downhole lengths and are not true widths. True widths are estimated at approximately 54% to 65% of reported lengths for drill holes TR-006 and TR-008 and are not known for drill holes TR-001 and TR-002.
As part of the starter pit modeling, the Company plans to rehabilitate existing tunnels where artisanal gold mining took place at the West Block. The aim is to extract mineralized materials in bulk from the tunnels for metallurgical testing. If the bulk sampling and metallurgical results are positive, the Company may undertake underground trial mining and evaluate the processing of mineralized material at regional toll milling facilities.
Figure 1. Plan view of the conceptual mineralization and drill hole traces, West Block, El Triunfo
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8597/318900_50c7b1b1641bdb12_002full.jpg
The desktop starter pit modeling is conceptual in nature. The Company has not estimated mineral resources or mineral reserves at the Project and has not completed a preliminary economic assessment, pre-feasibility study or feasibility study. Additional drilling will be required to confirm the continuity of the near-surface mineralization and improve geological confidence, and there is no certainty that the internal studies will result in the definition of mineral resources or support a decision to develop a starter pit. The conceptual starter pit dimensions are preliminary and may change.
Regional Processing Capacity
Several third-party processing plants operate in the Departments of La Paz and Oruro, approximately 130 to 320 kilometers from the Project, and represent potential toll milling options for bulk sample material. These plants include carbon-in-pulp and leach circuits designed for gold recovery, as well as flotation circuits that are potentially suited to the silver, zinc and lead content of El Triunfo mineralization. The regional plants are summarized in Table 2.
Table 2. Regional Processing Capacity Near El Triunfo
| Plant | Location | Distance | Circuit | Capacity |
|---|---|---|---|---|
| Jacha Kollo (Grupo Minero Bonanza) | La Paz | 130 km | Carbon-in-pulp cyanidation, desorption, refining |
60 t/day |
| Planta de Lixiviación de Viacha (Cooperativa Aurífera Asunción Totoral) | La Paz | 130 km | Gold leach | 100 t/day |
| Colquiri (Corporación Minera de Bolivia) | La Paz | 220 km | Gravity and differential flotation, tin-zinc |
2,000 t/day, plus 1,000 t/day existing |
| Bonanza Oruro / Minandina | Oruro | 300 km | Flotation, three ball mills, two circuits |
100 t/day; 40 t/day leach circuit under construction |
| Ingenio Machacamarca (Corporación Minera de Bolivia) | Oruro | 320 km | Flotation and gravity concentration, tin |
100 t/day |
Note: Plant information has been compiled by the Company and has not been independently verified. Distances from the Project are approximate. The Company has not entered into any agreement with the operators of these plants, and the suitability of El Triunfo material for processing at any of these plants will depend on the results of metallurgical studies. There is no assurance that processing capacity will be available to the Company on acceptable terms or at all.
2026 Detailed Sampling Results
The first campaign, completed in February 2026, was focused primarily on the southern sector of the East Block, with additional reconnaissance and sampling in the southern part of the West Block. Fourteen samples, TR-001 through TR-014, were collected during this phase.
Guided by those results, the second campaign, completed in July 2026, was focused primarily on the southern sector of the West Block and extended farther into the southwestern sector of the West Block. Regional reconnaissance was also carried out in the northeastern part of the East Block. Twenty-three samples, TR-015 through TR-037, were collected during this phase.
Table 3. 2026 Sampling Results
| Sample | 2026 Campaign | Sample type | Width (m) | Au (g/t) | Ag (g/t) | Zn (%) | Pb (%) | Sb (%) |
|---|---|---|---|---|---|---|---|---|
| TR-028 | July | Float | – | 12.90 | 3.6 | 0.0015 | 0.0012 | <0.0002 |
| TR-022 | July | Selected mine dump material | – | 2.78 | >100 | >1.00 | >1.00 | 0.0280 |
| TR-029 | July | Float | – | 2.58 | 0.2 | 0.0010 | 0.0005 | 0.0002 |
| TR-017 | July | Select | – | 1.89 | 1.9 | 0.0122 | 0.0075 | 0.0021 |
| TR-014 | February | Select | 2.0 | 0.72 | 7.7 | 0.0043 | 0.0271 | >1.00 |
| TR-016 | July | Select | 0.05 | 0.57 | 49.8 | 0.2000 | >1.00 | 0.0560 |
| TR-021 | July | Select | 0.20 | 0.38 | 11.6 | 0.0293 | 0.1150 | 0.0464 |
| TR-015 | July | Select | 0.70 | 0.37 | 1.4 | 0.0010 | 0.0011 | 0.0046 |
| TR-020 | July | Select | 0.10 | 0.32 | 14.2 | 0.0217 | 0.0121 | 0.0017 |
| TR-001 | February | Select | 0.02 | 0.27 | 0.2 | 0.0041 | 0.0011 | 0.0008 |
| TR-018 | July | Select | 0.07-0.10 | 0.26 | 5.2 | 0.0540 | 0.0966 | 0.0606 |
| TR-032 | July | Float | – | 0.05 | 0.2 | 0.0012 | 0.0022 | 0.0003 |
| TR-033 | July | Float | – | 0.04 | 0.3 | 0.0008 | 0.0004 | <0.0002 |
| TR-004 | February | Select | <0.01 | 0.03 | 0.2 | 0.0034 | 0.0022 | 0.0003 |
| TR-023 | July | Select | – | 0.02 | 1.2 | 0.1455 | 0.0080 | 0.0008 |
| TR-025 | July | Chip channel | 2.0 | 0.02 | 0.6 | 0.0080 | 0.0046 | 0.0084 |
| TR-002 | February | Select | 0.01-0.02 | 0.01 | 0.2 | 0.0068 | 0.0036 | <0.0002 |
| TR-003 | February | Select | <0.02 | 0.01 | <0.2 | 0.0046 | 0.0023 | <0.0002 |
| TR-005 | February | Chip channel | 3.0 | 0.01 | <0.2 | 0.0047 | 0.0016 | 0.0004 |
| TR-006 | February | Select | <0.01 | 0.01 | <0.2 | 0.0036 | 0.0014 | <0.0002 |
| TR-007 | February | Chip channel | 4.0 | 0.01 | <0.2 | 0.0045 | 0.0011 | 0.0004 |
| TR-008 | February | Chip channel | 3.0 | 0.01 | 0.2 | 0.0076 | 0.0022 | <0.0002 |
| TR-009 | February | Chip channel | 2.5 | 0.01 | <0.2 | 0.0084 | 0.0026 | <0.0002 |
| TR-010 | February | Chip channel | 3.0 | 0.01 | 0.2 | 0.0056 | 0.0014 | 0.0002 |
| TR-011 | February | Select | – | 0.01 | <0.2 | 0.0120 | 0.0020 | <0.0002 |
| TR-012 | February | Chip channel | 3.0 | 0.01 | <0.2 | 0.0062 | 0.0019 | <0.0002 |
| TR-013 | February | Select | 0.02 | 0.01 | 8.5 | 0.0135 | 0.2720 | 0.0009 |
| TR-027 | July | Chip channel | 2.0 | 0.01 | 2.1 | 0.0214 | 0.0111 | 0.0022 |
| TR-031 | July | Float | – | 0.01 | 0.2 | 0.0019 | 0.0014 | <0.0002 |
| TR-019 | July | Select | – | <0.01 | <0.2 | 0.0016 | 0.0027 | 0.0008 |
| TR-024 | July | Chip channel | 1.0 | <0.01 | <0.2 | 0.0061 | 0.0013 | <0.0002 |
| TR-026 | July | Chip channel | 2.0 | <0.01 | <0.2 | 0.0074 | 0.0021 | 0.0011 |
| TR-030 | July | Float | – | <0.01 | <0.2 | 0.0011 | 0.0004 | <0.0002 |
| TR-034 | July | Select | – | <0.01 | <0.2 | >1.00 | 0.0062 | 0.0112 |
| TR-035 | July | Chip channel | – | <0.01 | <0.2 | 0.0193 | 0.0005 | 0.0002 |
| TR-036 | July | Chip channel | – | <0.01 | <0.2 | 0.0083 | 0.0008 | 0.0002 |
| TR-037 | July | Chip channel | 2.0 | <0.01 | 0.2 | 0.0110 | 0.0060 | 0.0004 |
Note: Select samples were collected from specific mineralized veins, structures or altered zones and are not necessarily representative of the full width or average grade of the mineralized structure. Float and mine dump samples do not represent in-situ widths. True widths of the mineralized structures have not been determined.
The sample locations and the distribution of the principal gold results are presented in Figure 2 below.
Figure 2. Location of 2026 exploration samples and gold assay results, El Triunfo
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8597/318900_50c7b1b1641bdb12_003full.jpg
Gold distribution across the 2026 sampling is heterogeneous, with anomalous values concentrated within specific quartz structures and fault zones. Channel samples collected across wider intervals generally returned lower gold values than selective samples taken directly from veins and structures, indicating that the higher gold values identified to date are associated with specific mineralized structures.
Photo Gallery








